[4]Deyong Wang, Tao Weng, Jiping Zhu*, Lu Lu, Guangxuan Liao. Sequential Decision Analysis of Fire Emergency and Rescue on Urban Successional Building Fires. Procedia Engineering 62 ( 2013 ) 1087 – 1095 The 9th Asia-Oceania Symposium on Fire Science and Technology, 2012
Release time:2021-07-27
Hits:
- Translation or Not:
- no
- Pre One:[3]Liu, NA (Liu, Naian) ; Liu, Q (Liu, Qiong) ; Lozano, JS (Lozano, Jesse S.) ; Zhang, LH (Zhang, Linhe); Deng, ZH (Deng, Zhihua) ; Yao, B (Yao, Bin) ; Zhu, JP (Zhu, Jiping); Satoh, K (Satoh, Kohyu). Multiple fire interactions: A further investigation by burning rate data of square fire arrays. PROCEEDINGS OF THE COMBUSTION INSTITUTE. 2013, 34(2): 2555-2564. DOI: 10.1016/j.proci.2012.06.098 (SCI)
- Next One:[5]D.Y. Wang, L.W. Pan, J.P. Zhu*, L. Lu, W.Q. Cai, G. X. Liao. Emergency Management Business Process Reengineering and Integrated Emergency Response System Structure Design for a City in China. Procedia Engineering, 2013(52), 371-376, 6th International Conference on Performance-based Fire and Fire Protection Engineering 2012